WOSB CertifiedSAM.gov ActiveD-U-N-S® 131554083We Deliver Nationwide
Customer Reviews

November 2026: The Vincent Thomas Bridge Closes for 16 Months

The harbor’s green suspension bridge closed November 7 for a full deck replacement. What it means for trucks, terminals and container deliveries.

Rows of stacked Hapag-Lloyd, UASC, Evergreen, Maersk and OOCL shipping containers at a terminal yard
Terminal trucks now detour around the closed bridge through Wilmington and Long Beach.

A Landmark Goes Dark

The Vincent Thomas Bridge, which connects San Pedro and Terminal Island, closed fully at 12:01 a.m. on November 7, 2026, for a deck replacement Caltrans expects to finish around March 2028. One-direction restrictions had run since March.

Trucks that normally cross from San Pedro now reach Terminal Island through Wilmington or Long Beach.

Long Beach Stays Open

Port of Long Beach chief executive Noel Hacegaba said the closure would not affect operations at Long Beach, which added extra evening and Saturday gates for six weeks starting in late October, excluding Thanksgiving week.

For container deliveries, we plan routes around the detour and confirm timing in writing. The bridge is part of our story: it appears in the Thank You, Long Beach band on our homepage. Read the delivery guide for site prep.

Sources

More Local Stories

Ready When You Are

Plan Your Container

Tell us the job and the ZIP. We match the closest depot with the right unit and send one itemized, dated quote.

Request a Quote
Call 805.429.4343