July 2024: Dairies, Digesters and the Four-Door Container
Renewable gas projects on dairies store motors with 12 to 18 month lead times. How MAAS Energy Works standardized on one container.

Parts That Cannot Wait in the Rain
MAAS Energy Works builds renewable natural gas projects on dairies, turning manure into energy. Replacement motors and parts can carry lead times of 12 to 18 months, so they wait on site on pallets. Storage has to be dry, secure and wide enough to load with a forklift.
Every dairy also has its own contact, billing entity and purchase order, which makes simple ordering as important as the steel itself.
One Unit for the Whole Network
We showed the team the 40’ High Cube Four-Door Open Side: four pairs of side doors that open the full length for forklift loading. Requests for it now come from MAAS sites across the country.
Read the full story, including the delivery map and the farmer portal we built, on the renewable energy page. For covered work bays, canopies join two units under one roof.