April 2024: Locking Down the Job Site for Build Season
Spring construction brings tools, materials and theft risk. How contractors size container storage for each phase of a build.

Storage Sized to the Schedule
A build uses different storage on day one than it does at framing or finish. Many general contractors start with a 20’ for tools and add a 40’ as materials arrive, then pull units as phases close.
One of our Las Vegas clients did exactly that, ordering a mix of 20’ and 40’ Container Line units sized to the phases of a multi-unit build. The contractor page tells the story.
Security Without Fuss
Steel walls, a lockbox over the padlock and placement where the site camera can see the doors cover most of the risk. Grade matters less for ground storage: a Wind and Watertight unit keeps tools dry at a lower price than one-trip.
Add an on-site office and the superintendent has a lockable desk, power and AC beside the storage.